Customization: | Available |
---|---|
After-sales Service: | Engineer Dispatch,Email, Agent |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEM | Unit | ZL-230 | ||
Locking Force | KN | 2300 | ||
Die Stroke | mm | 415 | ||
Ejection Force | KN | 130 | ||
Ejection Stroke(Max) | mm | 100 | ||
Die Thickness(Min-Max | mm | 200-650 | ||
Tie Bar Diameter | mm | 100 | ||
Space Between Tie Bars(W×H) | mm | 530*530 | ||
Shot Position | mm | 0,-100 | ||
Plunger Stoke | mm | 200 | ||
Traverse Stoke | mm | 300 | ||
Injection Force(Max) | KN | 155 | ||
Diameter Of Plunger | mm | 70 | 75 | |
Max..Shot Weight(Zn) | Kg | 2.95 | 3.6 | |
Hydraulic Pressure | Mpa | 14.5 | ||
Motor Power | KW | 15 | ||
Crucible Capacity(Zn) | Kg | 500 | ||
Capacity Of Accumulator | L | 30 | ||
Furnace Energy Consumption |
Diesel | KG/L | 6.3 | |
Electric | KW | 30 | ||
Capacity Of Oil Tank | L | 450 | ||
Machine Size(L×W×H) | mm | 5400*1620*2300 | ||
Weight of Machine | kg | 8900 |
Two-Stage Injection Adjustment |
High Speed Clamping |
Low Pressure Clamping Device |
Automatic Mould Thickness Adjustment |
Computer - Controlled Lubrication System. |
Hydraulic Moving Clamping Unit |
Hydraulic Multiple Ejector |
Nozzle Heater , Gooseneck Heater |
Inclined Clamping Unit |
Fuel-Injection Furnace |
Siemens 200 control system with LCD monitor |