ITEM | Unit | ZL-280 | ||
Locking Fore | KN | 2800 | ||
Die Stroke | mm | 470 | ||
Ejection Force | KN | 130 | ||
Ejection Stroke ( Max ) | mm | 100 | ||
Die Thickness (Min-Max) | mm | 220-650 | ||
Tie Bar Diameter | mm | 110 | ||
Space Between Tie Bars(W×H) | mm | 560×560 | ||
Shot Position | mm | 0,-100 | ||
Plunger Stroke | mm | 200 | ||
Traverse Stroke | mm | 300 | ||
Injection Force (Max) | KN | 158 | ||
Diameter Of Plunger | mm | 70 | 75 | |
Max. Shot Weight (Zn) | Kg | 3.1 | 3.8 | |
Hydraulic Pressure | Mpa | 14.0 | ||
Motor Power | KW | 18.5 | ||
Crucible Capacity (Zn) | Kg | 550 | ||
Capacity Of Accumulator | L | 30 | ||
Melting Furnace | Diesel-fired Furnace | Kg/H | 6.3 | |
Electric Furnace | KW | 40 | ||
Capacity Of Oil Tank | L | 450 | ||
Machine Size (L×W×H) | mm | 5500×1750×2500 | ||
Weight Of Machine | Kg | 10500 |
Two-Stage Injection Adjustment |
High Speed Clamping |
Low Pressure Clamping Device |
Automatic Mould Thickness Adjustment |
Computer - Controlled Lubrication System. |
Hydraulic Moving Clamping Unit |
Hydraulic Multiple Ejector |
Nozzle Heater , Gooseneck Heater |
Inclined Clamping Unit |
Fuel-Injection Furnace |
Siemens 200 control system with LCD monitor |